Customization: | Available |
---|---|
Condition: | New |
Certification: | CE, RoHS, GS, ISO9001 |
Still deciding? Get samples of US$ 1.8/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Material & Temper | Aluminum Alloy ADC12 ,A380 |
Surface Treament | Mill-Finished, Powder Coating,Polishing, Brushing, etc. |
Colour | Shinning Polishing , powder coated as customer demand |
Film Standard | Powder coating: 60-120 μm |
Part Weight | from 3 g --- 20kgs |
Application | Industry fittings and Construction and Decoration. |
Casting Machine | 200-1200 tons |
Capability | Output 100 tons per month. |
New Moulds | Opening new mould about 30 days . |
Fabrication |
Die designing→Die making→Smelting&alloying→QC→Die casting→remove burrs →QC→Surface treatment→QC→Packing→QC→Shipping→After Sale Service |
Deep Processing | CNC / Cutting / Punching / Checking / Tapping / Drilling / Milling |
Certification | 1. ISO9001-2008/ISO 9001:2008; |
2. GB/T28001-2001(including all the standard of OHSAS18001:1999); | |
3. GB/T24001-2004/ISO 14001:2004; | |
4. GMC. | |
MOQ | As custimer's . Usually 10-12 tons for a 20'FT; 20-23 tons for a 40HQ. |
Free Samples | YES |
Payment | 1. T/T: 30% deposite, the balance will be paid before delivery; |
2. L/C: the balance irrevocable L/C at sight. | |
Delivery time | 1. 15 days production ; |
2. If opening mould, plus 10-20 days. | |
OEM | Available. |
Chemical Composition of Aluminum Alloy :
Alloy | Si | Fe | Cu | Mn | Mg | Zn | Ni | Sn | Al |
ADC12 | 9.6-12.0 | 0.3-0.6 | 3.0-3.5 | 0.3-0.5 | 0.2-0.3 | 0.6-0.9 | 0.2-0.5 | <0.3 | Al |
A380 | 7.5-9.5 | 1.3 | 3.0-4.0 | 0.5 | 0.1 | 3 | 0.5 | 0.35 | Al |
Products show
FAQ
A: We are factory.
A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
A: Payment 30%TT in advance. 70% T/T before shippment
My name card